The Taco Bell Defy project that was completed in 2022. This two-story design is a brand new concept brought to life by Vertical Works LLC, Workshop, and PD Instore. This chain’s location features an elevated kitchen and vertical lifts that bring food directly to the customer at one of their four drive through lanes. The goal of this design is to cut down on service time to less than two minutes per customer. Three lanes are dedicated to customers who order via the app and third-party food delivery drivers, the fourth lane is dedicated to traditional drive-through orders.

M3Sixty provided 2,700 SF of CENTRIA Style Rib Siding in Rich Black, and 1,800 Linear Feet of Knotwood USA Battens.

Architect: WORKSHOP
General Contractor: Engelsma Construction, Inc.