Hmong College Prep Academy was a project that was completed in St. Paul, MN. HCPA originally opened its doors in 2006 and since then has undergone multiple project phases to expand and improve the school. In 2013 the school began its 3rd phase project which consisted of the addition of a new 78,300 SF high school. In 2018 phase 4 was completed with the new addition of the 87,000 SF elementary school and 10,000 SF gymnasium. The final phase was completed in 2022 with the addition of the 72,000 SF middle school, a skyway that connects the addition to main building, as well as updates to the existing campus.
This impressive college preparatory K-12 campus features a massive gym, two kitchens, a theatre, state of the art classrooms, a media center, parking ramp, a robotics lab, a turf field, and cafeterias that can comfortably fit its current 2,400 students.
M3Sixty provided 17,600 square feet of CENTRIA Style-Rib Panels in the color Limestone, 4,022 square feet of Econolap in the color Slate Gray, 6,468 square feet of Style-Rib panels in the custom color Flower Pot. We also provided over 16,000 square feet of flatstock in the colors Limestone, Slate Gray, and the custom color Flower Pot.
Architect: Kodet Architectural Group
General Contractor: RJM Construction
Installer: MG McGrath
Awards: 2014 Merit Award from the American Institute of Architects Minneapolis chapter.